A project report sample shows how cost, finance and repayment fit together in a real plan. This page gives six small business samples with project cost, bank loan, EMI and a coverage check. Use them to learn the structure, then replace every number with your own quotations and local prices.
Each sample is deliberately short. For a complete document, follow our guides to the project report format and the detailed project report.
Quick answer: A good project report sample contains a project cost table, a means-of-finance table, a monthly or yearly sales and cost projection and a repayment check. The six samples below cover tailoring, a bakery, a flour mill, a mobile repair shop, a packaged water unit and a poultry farm. Each shows total cost, bank loan, EMI and how many times monthly surplus covers the instalment.
Key Takeaways
- Every sample uses illustrative numbers; replace them with local quotes.
- A healthy plan shows monthly surplus well above the EMI, ideally 1.5 times or more.
- Own contribution of 10% to 20% is common; the bank finances the rest.
- Always include working capital in the project cost.
- Link to the full reports for schemes such as PMEGP, Mudra and poultry farming.
What Every Project Report Sample Includes
| Part | What it shows |
|---|---|
| Project cost | Machinery, premises, stock and working capital |
| Means of finance | Own money and bank loan |
| Projection | Sales, variable cost, fixed cost and surplus |
| Repayment | EMI and the coverage ratio |
| Notes | Assumptions, risks and licences |
Project Report Sample 1: Tailoring and boutique unit
| Project cost item | Amount (₹) |
|---|---|
| Sewing machines and tools | 1,20,000 |
| Furniture and display | 40,000 |
| Fabric and material stock | 50,000 |
| Working capital (2 months) | 40,000 |
| Total project cost | 2,50,000 |
| Finance and repayment | Figure |
|---|---|
| Own contribution | ₹25,000 |
| Bank loan | ₹2,25,000 |
| EMI at 11% for 4 years | ₹5,815 |
| Monthly sales | ₹90,000 |
| Monthly surplus before EMI | ₹23,500 |
| Surplus ÷ EMI | 4.0 times |
Project Report Sample 2: Home bakery
| Project cost item | Amount (₹) |
|---|---|
| Oven, mixer and moulds | 2,20,000 |
| Packaging and display | 50,000 |
| Raw material stock | 60,000 |
| Working capital (2 months) | 70,000 |
| Total project cost | 4,00,000 |
| Finance and repayment | Figure |
|---|---|
| Own contribution | ₹60,000 |
| Bank loan | ₹3,40,000 |
| EMI at 11% for 5 years | ₹7,392 |
| Monthly sales | ₹1,50,000 |
| Monthly surplus before EMI | ₹35,000 |
| Surplus ÷ EMI | 4.7 times |
Project Report Sample 3: Flour and spice mill
| Project cost item | Amount (₹) |
|---|---|
| Pulveriser and flour mill | 3,50,000 |
| Electrical and installation | 60,000 |
| Raw material stock | 90,000 |
| Working capital (2 months) | 1,00,000 |
| Total project cost | 6,00,000 |
| Finance and repayment | Figure |
|---|---|
| Own contribution | ₹60,000 |
| Bank loan | ₹5,40,000 |
| EMI at 11% for 5 years | ₹11,741 |
| Monthly sales | ₹2,20,000 |
| Monthly surplus before EMI | ₹25,400 |
| Surplus ÷ EMI | 2.2 times |
Project Report Sample 4: Mobile repair and accessories shop
| Project cost item | Amount (₹) |
|---|---|
| Repair tools and testers | 90,000 |
| Shop interiors | 60,000 |
| Initial stock of parts and accessories | 1,50,000 |
| Working capital (2 months) | 50,000 |
| Total project cost | 3,50,000 |
| Finance and repayment | Figure |
|---|---|
| Own contribution | ₹52,500 |
| Bank loan | ₹2,97,500 |
| EMI at 12% for 4 years | ₹7,834 |
| Monthly sales | ₹1,60,000 |
| Monthly surplus before EMI | ₹22,800 |
| Surplus ÷ EMI | 2.9 times |
Project Report Sample 5: Packaged drinking water unit
| Project cost item | Amount (₹) |
|---|---|
| Purifier plant and bottling set-up | 7,00,000 |
| Shed, electrical and plumbing | 2,50,000 |
| Bottles, caps and initial stock | 1,50,000 |
| Working capital (3 months) | 2,00,000 |
| Total project cost | 13,00,000 |
| Finance and repayment | Figure |
|---|---|
| Own contribution | ₹2,60,000 |
| Bank loan | ₹10,40,000 |
| EMI at 11% for 6 years | ₹19,795 |
| Monthly sales | ₹4,20,000 |
| Monthly surplus before EMI | ₹83,999 |
| Surplus ÷ EMI | 4.2 times |
Project Report Sample 6: Poultry Farm
Poultry has its own cycle of batches, feed costs and mortality, so it needs more detailed assumptions than the samples above. Our poultry farming business plan gives a full broiler example, with cost per kg, profit per batch, price sensitivity and DSCR.
How the Samples Compare
| Sample | Project cost | Bank loan | EMI | Surplus ÷ EMI |
|---|---|---|---|---|
| Tailoring and boutique unit | ₹2,50,000 | ₹2,25,000 | ₹5,815 | 4.0 times |
| Home bakery | ₹4,00,000 | ₹3,40,000 | ₹7,392 | 4.7 times |
| Flour and spice mill | ₹6,00,000 | ₹5,40,000 | ₹11,741 | 2.2 times |
| Mobile repair and accessories shop | ₹3,50,000 | ₹2,97,500 | ₹7,834 | 2.9 times |
| Packaged drinking water unit | ₹13,00,000 | ₹10,40,000 | ₹19,795 | 4.2 times |
The surplus is before the owner’s own drawings, so the real cushion is smaller. A higher ratio means more room for sales to fall without missing instalments. Banks prefer a margin of safety, so test each plan with a 15% fall in sales.
Scheme-Specific Samples
- PMEGP: see our PMEGP project report for subsidy and own-contribution tables.
- Mudra loans: the Mudra loan project report article covers Shishu to Tarun Plus.
- Investors: read the business plan sample for a story-driven plan.
- Banks: our guide to a project report for a bank loan shows what lenders check.
How to Adapt a Project Report Sample
- Pick the sample closest to your trade.
- Replace machinery and stock costs with written quotations.
- Change the rent, wages and power bills to match your town.
- Recompute the loan, EMI and surplus using your own sales estimate.
- Add a paragraph on your experience and your market.
- Run a 15% sales-fall test and adjust the plan.
- Proofread the totals so cost, finance and projections agree.
To save time, enter your numbers in the project report maker and print a clean report.
Mistakes When Copying a Sample
- Using the numbers as they are: bank officers see identical figures across files.
- Skipping local quotes: prices differ across cities.
- Ignoring licences: food and water units need registrations.
- Overstating sales: an optimistic month-one target damages credibility.
- Missing working capital: every sample above includes it for a reason.
FAQs on Project Report Sample
What is a project report sample?
It is a worked example of a project report that shows the cost, finance, projection and repayment sections for a specific business.
Can I copy a project report sample for my bank loan?
Copy the structure, not the numbers. Replace costs, prices and sales with your own data, because banks check them.
Which sections must a project report have?
It needs project cost, means of finance, sales and profit projections, loan repayment details and a short business description.
How long should a small business project report be?
Short loans often need 3 to 8 pages. Larger loans and schemes may need more, with quotations attached.
What coverage ratio do banks like?
Banks usually want the debt service coverage ratio at 1.25 or higher, and 1.5 or above is safer.
Do all samples use the same loan terms?
No. The rate and tenure differ by sample and lender. Use your bank’s actual terms.
Where can I find a sample for my business?
Start with these six, then read the scheme-specific and trade-specific guides linked on this page.
Can I make a project report online for free?
Yes. A free generator can build the tables, and you can edit the assumptions before printing.
Start With the Closest Sample
Choose the project report sample nearest to your business, update the numbers and test your coverage ratio. Then browse more project report guides, use the free business tools and visit the Business Reports homepage.
Business Reports is an independent information website. We are not affiliated with, endorsed by or acting for any government department, bank, NBFC, KVIC, NABARD, SIDBI or MUDRA, and we do not provide loans or process applications. Figures are indicative; confirm details on official portals or with your bank. Read our disclaimer and advertising disclosure.